Kai takes another turn
The movement preview reaches a clean internal package check. The next attempt crashes at launch, and the project returns to its earlier state.
Kai starts, stops, turns around and goes through the shop door. The record gets a little further than he does.
The first internal movement package of 22 November launched cleanly. Its flat-ground movement, shop entry and return, and scripted battle checks passed. This carries the 15 November preview past the package launch check that was missing then.
Built and packaged; not accepted until Nic has played it. The attempt did not keep the movement changes in the working project. The project was restored after a later check failed. Demo 0.1.0 is unchanged.
Through the door
The flat-ground sequence exercised walking and running starts and stops, a reversal of direction, and turns in place. Separate before-and-after checks covered a slope, doors and reduced motion in the editor. The packaged checks then covered flat ground, the shop door and battle.

Both pictures are stills from that first package. They show the recorded check, not continuous movement or a judgement that the motion feels right. Companion travel, turning contact and ordinary play still need review. No new movement performance measurement is claimed. Door and ledge motion-warp actions are not delivered.
Two reasons to put it back
The first attempt stopped at the later Reduce motion preference check. The game reported a configuration name; the checker expected a file path and treated the name as a write outside the private test copy. The Coordinator checked the actual write and recorded this as a checker error. The original save and settings were unchanged, and the project was restored.
A second package was made with that proof corrected. It crashed during the packaged flat-ground launch, before that check could complete. That attempt was also restored. A narrowly limited retry change has source review, but has not yet passed a real run. Reliable startup and completed movement acceptance remain open.
The first package’s clean checks still count. They do not make the second launch clean, or make either attempt an accepted movement update.
The retained High Pass shore and stair remain at their 17 November checkpoint. The wider journey remains unfinished.